SORG Polska was awarded the contract for a modernisation and complete furnace renewal, including the batch house and batch and cullet transport, for Qemetica Glass Sp. z o.o, Poland’s largest manufacturer of glass lanterns for grave lights.
The scope of supply and services ranged from the design and construction to the delivery of the steel, the refractory material, working end, forehearths and regenerators, to the heating up and filling. SORG Polska carried out everything from the modernisation of the batch house, with the batch and cullet transport, to the installation of the steel and refractory material.
As part of the work, the gas fired furnace was modified to enable a boosting system to be installed at a later date. SORG Polska also provided systems for the heating, cooling and exhaust gas, as well as transporting the IS machines, along with their cabling and piping.
Qemetica Glass Sp. z o.o. showed a high level of trust in the capabilities of SORG Group and demonstrated exceptional cooperation, all of which helped to make it such a successful project.